Use the history of outages and their operational consequences rather than assuming a fixed downtime cost. Record backup processing, missed deadlines and additional handling separately. Compare a repair strategy with replacement under the same workload assumptions. Future availability remains uncertain, so show how the decision changes if the expected outage pattern is different.
Use actual downtime records and realistic recovery assumptions. An occasional stoppage and a persistent loss of service require different replacement arguments and should not be represented by the same estimate.
Back to news & insights