When a trolley or container is included in a textile weighing operation, its mass must be handled consistently. Otherwise a moisture calculation can describe a change in container weight instead of a change in water retained by the textiles. Use a suitable scale and a documented tare procedure, and identify the container used for each measurement.
Keep the dry and post-extraction textile weights tied to the same batch. Record whether the displayed reading already excludes the container so it is not subtracted twice. Check for changes such as a different trolley or material left inside it before comparing results. If the measurement basis is uncertain, repeat the observation through the approved process rather than reporting a precise percentage from incompatible weights. A simple weighing record with batch identity, container reference and net textile mass makes the result easier to review with the equipment supplier.
Back to news & insights