INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

Laundry Production Planning: Include Washer and Dryer Handling Time

Measure from the point a machine becomes available until it is ready for the following load.

Measure from the point a machine becomes available until it is ready for the following load. This includes loading, program time, unloading and necessary preparation. If a 45-minute program requires another 15 minutes of handling, the processing slot is an hour. Use observed turnaround rather than controller time when comparing equipment output and staffing needs.

Measure the interval from one batch being ready to load until the next can start. This exposes handling time that a controller's wash or dry duration does not include.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation