Connection requirements tell the installation team what services must be provided. Running consumption describes actual use over a stated workload and period. Keep the two sets of information separate in a comparison sheet. A connection rating should not be presented as a measured bill, nor should an average consumption figure replace installation design information.
Ask for both installation requirements and the basis of any consumption estimate. One describes what the site must provide; the other describes use under stated operating conditions.
Back to news & insights