Review delivery access, structural suitability, water, drainage, electrical supply and dryer ventilation at the new site. Include the movement of dirty and clean textiles and the positions needed for service. Existing equipment may need a different installation arrangement after relocation. Have qualified site specialists review model-specific requirements before setting a production restart date.
Treat the new building as a fresh installation survey. Existing machine suitability does not establish that the new structure, utility supply or access route can support it unchanged.
Back to news & insights