Continuous operation is a reason to investigate, not proof that the replacement should simply be larger. Record batch size, textile mix, cycle duration and idle time between loads. Check whether the existing installation or process is limiting performance. Compare replacement proposals against the usable output required, including time reserved for cleaning, servicing and unexpected interruptions.
Separate active drying from waiting, interruptions and repeat cycles in the log. Continuous occupancy alone does not establish that a larger replacement is the correct response.
Back to news & insights