Short arrival peaks require a time-based schedule, not just a daily kilogram total. Plot when sorted loads become available and when clean textiles are required. Include the time between batches and any restrictions on mixing loads. Compare extra machines with collection changes or buffered linen stock so the proposed solution addresses the peak rather than an average.
Plot arrival times against required dispatch times. The usable processing window between them often explains why a machine sized from the daily average cannot meet a short delivery deadline.
Back to news & insights