Tilting Industrial Washer-Extractor
Available capacities: 120 / 130 kg.

Tilting industrial washer-extractors combine washing and extraction for large laundry batches. Confirm the tilting configuration and installation requirements for your selected capacity.
Capacity options
- 120 kg — Listed model: XGQ-120F; drum: 1200 L; extraction speed: 670 rpm. Confirm the supplied tilting configuration in the quotation.
- 130 kg — Request the model-specific drum volume, extraction speed and tilting configuration.
Model selection
Choose a capacity for your largest sorted batch and textile type. Dimensions, electrical supply, water, drainage and foundation requirements vary by model. Request the current technical sheet and installation drawing with your quotation. OEM and ODM enquiries are welcome.
Need a technical data sheet? Include your destination, available power supply and required capacity in your enquiry.
What’s next for your laundry?
Let’s find the equipment that fits your project.
