Turn each important control requirement into a demonstration step with an expected result. Include permissions, program selection and relevant operator messages. Record the controller version and any limitations. A display containing a feature name does not necessarily demonstrate the complete function or confirm that it is enabled on the configuration being purchased.
Provide a short list of functions to demonstrate on the quoted controller. Record limitations and access permissions so the buyer does not confuse an optional capability with a standard included function.
Back to news & insights