Extraction G-force depends on drum radius as well as rotational speed. The relationship is G = r × (2π × RPM / 60)² / 9.80665, with r in metres. This explains why RPM alone cannot establish equivalent centrifugal acceleration across washers with different drum sizes.
For an illustrative radius of 0.5 metres and a speed of 600 RPM, the calculated acceleration is approximately 201 G. These are example inputs, not specifications for a MEIDI model. Use the manufacturer's confirmed values for the exact quoted machine and do not use this calculation to authorise a speed change. The calculated acceleration also does not establish the final moisture content: textile composition, load conditions and the approved program remain relevant. A purchasing comparison should therefore separate the mechanical specification from measured extraction results under defined trial conditions.
Back to news & insights