Examine whether the load contains incompatible soil levels, textile constructions or preparation needs. Record its weight and the process used, then compare a controlled compatible batch. Review machine or dosing concerns through qualified support where necessary. Uneven results should not automatically be treated as proof that every load needs a more intensive program.
Compare item types and their preparation within the affected batch. A load may meet its weight limit yet contain incompatible goods or conditions that require a different approved sorting approach.
Back to news & insights