The next finishing operation determines the required condition of bed linen leaving drying. Some workflows require a controlled intermediate moisture condition rather than fully dried textiles. Agree that requirement with the finishing equipment and textile guidance. Compare the complete process; maximum drying is not automatically the correct preparation for every finishing route.
Agree the required condition at the next finishing stage. Fully drying every item may be inconsistent with the intended finishing process, so equipment planning should cover the whole route.
Back to news & insights