Supply the approved installation drawing, mounting instructions and model-specific structural information before anchoring work begins. Confirm the documentation revision and site review. Do not use hole positions from a similar cabinet as a substitute. Record any discrepancy for resolution rather than allowing installation convenience to change the approved mounting arrangement.
Check that the drawing revision matches the delivered model. Foundation and anchoring work should not proceed from a generic illustration that omits the machine's specific installation requirements.
Back to news & insights