Delicate textiles need an extraction setting that respects their care instructions and the approved wash process. A higher available spin speed is not a reason to use it on every fabric.
Ask which program parameters are adjustable and who can change them. Assess the finished textile as well as the water removed. A trial should record damage, creasing and downstream handling alongside moisture, because a shorter drying stage is not useful if it compromises the goods being processed.
Back to news & insights