Identify the batch, textile group, dry weight, machine, program and relevant chemical information. Record deviations, alarms and the result of the quality check. Keep the date and responsible operator clear. This creates a traceable link between a complaint and its processing conditions rather than leaving staff to reconstruct the load from memory.
Keep the record short enough for routine use but specific enough to identify changes. The model, program revision and textile category are more useful than a generic note that washing was completed.
Back to news & insights