Identify the machine and configuration, each required utility, connection location and the party responsible for providing it. Attach the current manufacturer information and mark items awaiting site confirmation. Include the exhaust and incoming-air design references. A coordinated schedule helps avoid different contractors preparing services from inconsistent sales or installation documents.
Identify the heating arrangement and model revision on the schedule. This prevents a contractor from preparing services for a preliminary option that was replaced during the quotation stage.