Exchange the approved configuration, installation drawings, utility requirements and site survey. Identify revision dates and a contact for resolving discrepancies. Record decisions before work proceeds. When the factory and contractor work from different versions, apparently minor differences can affect connection positions, service access or readiness for commissioning.
Use the final model-specific drawings and utility schedule. Clearly mark superseded versions so the contractor does not prepare connections from a document issued before the configuration was agreed.