Use textile-care requirements, compatible load composition and the laundry's approved process as the basis for program selection. Confirm that the machine configuration supports the required operation. Keep unfamiliar textiles out of routine batches pending review. A program name alone does not explain its settings or establish suitability for every item with a similar description.
Record the approved textile category beside each program. This helps operators select consistently and prevents a convenient program name from being treated as suitable for every incoming load.
Back to news & insights