A faster extraction setting may remove more water under suitable conditions, but an energy-saving claim needs measurements across the complete process. Include washer electricity, actual remaining moisture and dryer energy for comparable finished batches.
Keep textile type, batch size and drying endpoint consistent. Additional extraction time, textile limitations and interrupted cycles can change the outcome. Report the measured conditions and range of results instead of turning one favourable trial into a general saving for every customer or application.
Back to news & insights