INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

What questions should laundry equipment buyers ask about available gas types?

Identify the available fuel specification and ask the manufacturer and qualified local installer to confirm compatibility of the proposed configuration.

Identify the available fuel specification and ask the manufacturer and qualified local installer to confirm compatibility of the proposed configuration. Obtain the relevant documentation before ordering. Do not assume similarly named gas supplies or interchangeable connection fittings establish suitability. Any proposed change needs proper review rather than an informal adjustment at installation.

Refer compatibility and connection questions to the manufacturer and qualified installer. Do not infer suitability from a generic 'gas heated' description or arrange an informal fuel conversion.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation