Measure towel returns, dry-equivalent weights, complete batch turnaround and downtime during busy sessions. Identify whether delays occur in washing, drying or staff availability. Review the current machine's installation and condition with appropriate specialists. The replacement should address the measured constraint rather than simply carry a larger capacity label.
Review why the existing washer no longer meets the need. Growth, breakdowns and changes in towel stock are different problems and may not all call for the same replacement size.
Back to news & insights