Confirm compatible dosing interfaces, approved connection arrangements and the responsibilities of the equipment and chemical suppliers. Record how the installation will be checked and the process settings established. Do not assume any dosing unit can be attached to any washer. Keep chemical delivery requirements separate from claims about wash quality or hygiene results.
Clarify the interface between the washer and the selected dosing system. Assign responsibility for compatibility, installation and process setup so neither supplier assumes the other has completed the work.
Back to news & insights