Explain the desired change and provide the site's complete utility information. Ask the supplier to identify the affected configuration, documentation and validation requirements. Obtain qualified installation review before approval. A different heat source can change more than the heater itself, including service, connection and operating assumptions.
Explain the site constraint behind the requested change. The manufacturer can then assess a complete suitable configuration rather than treating heating selection as a minor option independent of installation.
Back to news & insights