INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

What should a laundry layout drawing show for an installation contractor?

Show machine identification, dimensions, service and operating clearances, connections and material routes.

Show machine identification, dimensions, service and operating clearances, connections and material routes. Mark existing services and proposed work separately. Include revision dates and unresolved items. The contractor needs a coordinated installation reference, not a marketing floor plan that omits the access and utility details required to position and connect the actual equipment.

Show the final equipment references, clearances and connection responsibilities. A drawing should distinguish confirmed dimensions from provisional space reservations so contractors know what still requires resolution.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation