Before comparing two commercial dryers, record the exact models, textile mix, dry batch weight, starting moisture, program and final dryness criteria. Include the whole cycle and note interruptions.
A comparison based only on displayed minutes can hide different loads or endpoints. Repeat representative batches on each machine under documented conditions. Use energy measurements separately from time measurements: a faster cycle and lower energy consumption are different claims and each needs its own evidence.
Back to news & insights