Provide the exact machine specification, intended use and destination to the qualified local adviser. Ask which documents and reviews apply to that equipment and installation. Keep their requirements in the order record. Do not assume that a document accepted for another country or product family will establish suitability for the proposed import.
Give the local adviser the actual product description and shipment details. Required documentation should be checked for the destination and transaction rather than copied from an unrelated previous import.
Back to news & insights