Record the machine configuration, system arrangement, operating combinations and checks required by the responsible designer or manufacturer. Preserve measured results with their conditions and instruments where applicable. Identify unresolved issues explicitly. An airflow assessment should be traceable to the installed system, not an undocumented statement that the room felt well ventilated.
Record the method, conditions and responsible qualified assessor with the result. A measurement without its context is difficult to interpret if the installation or operating arrangement later changes.
Back to news & insights