INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

What should be checked before connecting a washer water supply?

Give the installer the model's water connection and supply requirements, then confirm the available services at the proposed location.

Give the installer the model's water connection and supply requirements, then confirm the available services at the proposed location. Consider simultaneous demand from other equipment. Resolve discrepancies before commissioning. The presence of a nearby pipe does not establish correct connection, supply performance or suitability for the intended washing process.

Have the responsible contractor compare the proposed supply with the machine documentation. Resolve connection and operating-condition questions before installation rather than assuming an existing hose arrangement is suitable.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation