Identify the oil and obtain an appropriate processing assessment before accepting the towels. Washing does not automatically establish that a contaminated textile is suitable for tumble drying. Keep affected loads separate and follow textile, chemical and equipment guidance. Do not experiment with increased heat to overcome an unresolved residue problem.
Ask the responsible textile or process specialist whether the contaminated goods are suitable for the proposed equipment at all. A standard towel program should not be assumed to address an unidentified oil residue.
Back to news & insights