After a long closure, use the manufacturer's restart guidance and arrange any required qualified inspection before normal operation. Review the reason for shutdown, outstanding faults and the condition of site utilities.
Do not assume that a machine left idle is automatically ready to run. Document the checks and authorised release. Where a trial is required, assess it under the approved procedure before committing customer linen or the full production schedule to the equipment.