Follow the manufacturer's storage instructions and agree responsibility for protection, inspection and access. Record the unit's condition on arrival and before installation. Consider the actual storage environment and duration rather than treating packed equipment as indefinitely protected. Recheck any requirements affected by a delayed project before scheduling commissioning.
Obtain the manufacturer's storage guidance and record the condition on arrival. Installation delays may change protection and inspection needs, so storage should be planned rather than treated as unattended waiting time.