INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

What should be checked when drying results change between shifts?

A change between shifts may involve different textile loads, washer extraction results, program selection or routine cleaning practices.

A change between shifts may involve different textile loads, washer extraction results, program selection or routine cleaning practices. Compare those records before assuming an equipment fault or blaming an operator.

Use the same definition of a completed, acceptable batch on each shift. If differences persist under comparable conditions, provide the records to qualified support. A shared handover log makes process changes visible and reduces repeated adjustments that leave the next team unsure which settings produced the original result.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation