Measure the entire route, including turning space and changes in level, against the relevant packed or unpacked dimensions. Clarify any permitted preparation with the manufacturer and handling team. Do not assume panels or assemblies can be removed for access. Confirm the plan before shipment so the machine's arrival does not become an unplanned alteration project.
Check packed and unpacked dimensions with the supplier and handling contractor. Do not assume protective parts can be removed on site merely to make equipment fit through an opening.