Obtain the model-specific handling instructions and ensure the responsible logistics team understands them. Confirm equipment weight, permitted lifting arrangements and transport restraints through the appropriate documentation. Do not infer lifting points from convenient-looking projections. Plan the operation with qualified personnel rather than improvising when the delivery vehicle reaches the site.
Give the handling contractor the manufacturer's instructions before equipment arrives. Do not assume a convenient-looking frame member is an approved lifting point or that an old handling plan suits a new model.
Back to news & insights