Treat relocation as a new installation review. Compare the destination's structure, access, utilities and drainage with the model requirements. Plan safe disconnection, transport and recommissioning through qualified personnel. An unchanged machine can encounter different constraints in another room, so its previous successful operation does not approve the new position automatically.
Review the new location as a new installation. Existing performance in one room does not verify the structure, drainage, services or access conditions in another.
Back to news & insights