A shared arrangement requires model compatibility and qualified system design, including how machines interact under different operating combinations. Do not connect separate dryer outlets together based only on available space. Obtain written review of the proposed installation. Each machine's requirements still matter when the exhaust equipment is shared.
Have the complete arrangement reviewed by a qualified designer. Combining outlets is not a simple space-saving choice; the proposed system must be assessed against the relevant equipment requirements.
Back to news & insights