For mixed wet and dry results, record the individual textile types, batch weight, program and incoming moisture condition. Note whether smaller pieces were trapped inside larger items and whether the pattern repeats.
A single cycle-time figure will not capture this variation. Review compatible load separation and the model's loading guidance before changing the entire program. Repeated abnormalities or alarms should be referred to the appropriate service team with the observations, not addressed by repeatedly overheating already dry items.
Back to news & insights