Check that the installed controls correspond to the approved configuration and that operators understand permitted program selection and alarm reporting. Verify functions through the appropriate commissioning procedure. Keep access permissions documented. A familiar-looking controller may have different settings or software, so training should address the actual unit entering service.
Demonstrate program selection and the documented operator response to messages. Confirm access permissions so routine staff do not unintentionally alter settings reserved for authorised process or service personnel.
Back to news & insights