INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

What should operators check before extending a drying cycle?

Before extending a drying cycle, check the permitted operator observations: selected program, load composition, incoming moisture and whether required routine cleaning has been completed.

Before extending a drying cycle, check the permitted operator observations: selected program, load composition, incoming moisture and whether required routine cleaning has been completed. Record alarms or a change from normal behaviour and follow the manual's response.

Extra time can mask a process or service problem. Compare a normal representative batch with the affected result before changing standard settings, and involve qualified support where heating, airflow or equipment condition needs investigation.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation