If a machine door does not release normally, follow the correct model's instructions and do not force it or bypass the lock. Record the program stage, display message and whether the cycle completed.
Contact authorised support if the documented operator response does not resolve the condition. Door protection may be linked to conditions the operator cannot safely verify by appearance alone. Production urgency does not justify an improvised opening method.
Back to news & insights