When a dryer runs with little apparent heat, record the selected program, stage, alarm messages and whether the relevant site utility is available through normal permitted checks. Note whether other machines are affected.
Do not open heating or electrical systems to investigate. Provide the observations to qualified support. A heating complaint may involve settings, supply or equipment condition, and an operator's report should preserve those possibilities rather than assigning a cause without evidence.
Back to news & insights