INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

What space should be reserved for clean linen after tumble drying?

Reserve clean-side space for unloading, inspection, folding or transfer to the next finishing stage.

Reserve clean-side space for unloading, inspection, folding or transfer to the next finishing stage. Size it around the largest batches and their release pattern, not just the dryer footprint. Keep circulation routes usable when trolleys are full. If completed loads cannot move away promptly, the resulting blockage can reduce the output of otherwise adequate equipment.

Include cooling, handling and the next finishing or storage step in the layout. A dryer exit that immediately becomes congested can limit production despite adequate machine capacity.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation