Visual fill varies with how textiles are folded, compressed or mixed. Two apparently similar loads can have different dry masses and behave differently during washing. Use a suitable scale and maintain textile-group records. Combine measured weight with drum-space guidance rather than replacing one imperfect estimate with another single-number rule.
Use weighed reference batches to calibrate the loading routine. Visual fullness can vary with folding, fabric bulk and moisture, so it is not a consistent substitute for the stated loading basis.
Back to news & insights