INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

Why should a qualified designer assess a commercial dryer exhaust system?

Dryer exhaust must be assessed against the model requirements and the actual route and operating arrangement.

Dryer exhaust must be assessed against the model requirements and the actual route and operating arrangement. A qualified designer can coordinate it with incoming air, cleaning access and relevant site requirements. Do not adopt a duct size from a different installation merely because the dryers have similar nominal capacities.

Provide the exact dryer and proposed route to the designer. Exhaust requirements should be assessed for the installed system rather than inferred from another machine with a similar kilogram rating.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation