INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

Why should a washer's transport restraints be handled exactly as its manual specifies?

Transport restraints are part of the manufacturer's handling and commissioning procedure.

Transport restraints are part of the manufacturer's handling and commissioning procedure. Incorrect removal, retention or replacement can affect the equipment. Have authorised personnel follow the model-specific instructions and record completion. Do not copy a procedure from a similar washer or assume that a visible bracket is disposable packing without checking its purpose.

Keep the transport and installation instructions with the receiving team. Removing or retaining the wrong item at the wrong stage can create problems that are not obvious from the cabinet's appearance.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation