Chemical use must match the textile, soil, water conditions and approved process. Follow the responsible supplier's instructions and site procedures rather than improvising concentration or combinations. Record authorised changes and assess results before wider adoption. A larger dose is not a universal response to poor cleaning and can introduce other process problems.
Agree responsibility for process changes with the chemical supplier and site team. Record revisions so a dosing adjustment is not introduced without a clear basis or applied inconsistently between shifts.
Back to news & insights