INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

Why should damp loads not be judged only by surface feel in a commercial laundry?

The outside of a bulky or bundled load can feel different from its interior.

The outside of a bulky or bundled load can feel different from its interior. Surface feel alone may therefore miss uneven moisture or lead to inconsistent decisions between operators.

Use the approved checks for the textile and application, with representative items assessed through safe handling. Keep the assessment method consistent during trials. If the same type of bundle repeatedly gives mixed results, review load composition and the supported drying process rather than extending time based on a single surface observation.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation