Door movement, closure and the relevant protective functions should be checked under the manufacturer's commissioning procedure before normal use. Make operators familiar with the approved opening and closing sequence. Do not bypass an interlock to complete a demonstration. Any unexpected behaviour should be resolved before the machine becomes part of a production schedule.
Include approved door and protective-function checks in the qualified handover process. A door closing visibly is not the same as verifying every required function associated with normal operation.