Operators and authorised service personnel need the access required by the equipment documentation and applicable site design. Keep storage and trolley positions from obstructing it. Have the qualified electrical installer review the arrangement. Accessibility should be considered in the normal working layout rather than depending on moving heavy equipment when attention is needed.
Keep access requirements in the installation drawing and operating rules. A space reserved on paper can become ineffective if it is routinely used for trolley parking or linen storage.
Back to news & insights