INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

Why should exhaust duct dimensions come from the commercial laundry machine documentation?

Exhaust requirements depend on the equipment and installation, not solely on its kilogram rating.

Exhaust requirements depend on the equipment and installation, not solely on its kilogram rating. Use the current model documentation as the starting point for qualified design. Resolve limitations or unusual routes with the responsible specialists. A universal duct dimension can overlook the conditions that determine whether the proposed system is acceptable.

Keep the model documentation with the exhaust design record. Similar-looking dryers can have different requirements, so an existing duct should not be reused solely because its outlet appears to fit.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation